banner
Home » News » Products News » Installation and commissioning news » Installation and Commissioning of Heating Cycle Equipment

Installation and Commissioning of Heating Cycle Equipment

Views:3     Author:Emma     Publish Time: 2018-12-08      Origin:Site

On December 3, the CHCT series heating cycle test system is being installed and commissioned successfully in Algeria.

The heating cycle test system can do heating cycle voltage test for XLPE cables. The system adopts temperature monitor to collect temperature signal through 8 groups of temperature control sensors. Then system will decide keeping running or to stop the process by comparing the signal with specified temperature. Our cable heating cycle test systems’ precision can reach to ±1℃. In addition, its’ capacity can reach to 160.0KVA.

CHCT series heating cycle test system

(CHCT Series Heating Cycle Test System)

For additional technical specifications on the CHCT series heating cycle test system available from Lint Top, contact us through sales@linttop.com or call us at +0086-516-85715085. 

LINT TOP is a young and vital team. Our principle is to work high efficiently, timely, orderly and rigorously.
Copyright © 2010 LINT TOP CABLE TECHNOLOGY CO., LTD. 

CONTACT US

    +86-15162145573
   +86-516-85715085
       +86-516-85716085
    sales@linttop.com
    ashley.yin
   +86-15162145573

PRODUCTS

GET IN TOUCH